Project work

Project work

Project work:
determination of the cost of the object at the stage of the feasibility study;
complex design of substations with voltage up to 750 kV;
designing technical re-equipment of electrical installations of all
voltage classes;
implementation of projects of connecting consumers to electric networks
all voltage classes;
Designing reactive power compensation systems at
substations 0,4-35kV;
design of connection to electric and thermal networks
power plants.
design of connection to electric networks of the wind and
solar power plants.
design of integrated telemechanics systems;
design of energy resources accounting and control systems
management (ASKOE, ASTOE, LUZOD).