Ltd. “Harkivpromenerho” performs next types of works:
Electrical work:
- Construction and technical re-equipment of substations 6-330 kV;
- installation of power and measuring transformers 6-150 kV ;
- installation and commissioning of switches 35-110kV.
- 6-10 kV cells (RPP \ KSO) re-equipment of installation of vacuum in and mixers and new relay protection
- Implementation of reactive power compensation installations at substations;
- installation and adjustment of relay protection and automation of electrical installations for voltage from 0.4 to 330 kV inclusive;
- implementation of integrated systems remotely and dispatch supervisor in the bathroom;
- installation and implementation of energy accounting and dispatch control systems (ASKOE, ASTOE, LUZOD);
Project work:
- determination of the value of the object at the stage of the feasibility study ;
- complex design of substations with voltage up to 750 kV;
- Design it’s night all grades upgrading electrical and Mr. frequency voltages away.
- Implementation of projects consumer connection to electric networks of cells and sat tension.
- designing of reactive power compensating installations at substations of 0.4-35kV;
- Design accession to power grids thermal and hydro electric stations at.
- Design accession to power grids wind and solar browser is ktrostantsiy.
- design of integrated telemechanics systems;
- design of energy resources accounting and dispatch control systems (ASKOE, ASTOE, LUZOD);
list of finished objects | |||||
Name The customer | Address and phone The customer | Scope of the contract | Period implementationRobby t | ||
LLC ” Interpipe NIKO TYUB” | 53201, Dnipropetrovsk region, the city of Nikopol, Trubnikov ave., 56 | Design, construction, installation, ny withkonalahodzhuvalni work: sokovoltn installation in a switchgear cell andx-1- S cable and p ozvodka indoors Substation# 4 ; installation of cable and x L and H and also (6kV and power and con and roll t); installation of KTPV-1600-6 / 0.4kV | 2018 | ||
PJSC “FED” | 61023, Ukraine, Kharkov, vul.Sumy, 132 | Reconstruction of transformer station pid-2 TS wash “FED” | 2018 | ||
PJSC “EUROCEMENT – UKRAINE ON “ | 64200, Kharkiv region , m.Balaklia , prommayda nchik | Development, assembling and Ipuskonalah at jenn systems of technical accounting of energy resources (electricity, gas, air, water) | 2017 | ||
LLC “MZ” DNIPROSTAL “ | 49051, Dnipro str., St.Dniprostalovskaya , 4 | Oh I rhanizatsi technical account Electricity in GRP-10, 35 kV | 2017 | ||
BB MSDYUSSHOR | 61060, m. Kharkiv, Pyotr Grigorenko Ave., 2 | Work on the overhaul of the systems we of electric energy from the CDF atvadzhennyam into commercial exploitation tion and local facilities for collecting and processing data (LUZOD) | 2017 | ||
PJSC “Vinnytsyaoblenergo “ | 21050, m. Vinnitsa, st.Magistrate, 2 | Reconstruction and me SS 110/35/10 kV “Tombs and-Pod and bcue ls'” | 2017 | ||
PJSC “Vinnytsyaoblenergo “ | 21050, m. Vinnitsa, st.Magistrate, 2 | Reconstruction and me PS 110/35/10 kV “Yar and w in” | 2017 | ||
VP P ishnic power supply to the system Dr P “H E K”Ukr e st st “ | 61003 Kharkiv, street Cooperative, 12/14 | In ik at ment he vowed to reconstructio ncells of 6 kV # 16 on the PS 330/110/6 kV ” Los is in “ | 2016-2017 | ||
Dr P ‘N E K “Ukr enerho” Western E C. | 79011 , m . Lviv and in in the street SC and ST iswho u b 2 T eul / fax (032) 256 – 32 – 23 | The complex is a lectromontazhny and x heat least and so on modern and zats uu panelcontrol pan Inn I PS 220 kV “Cal train and2” by affirmed work about what Total project «Modern zats Exposure and panelcontrol pan Inn I PS 220 kV” Cal train and2 “with about OJ omitted complete set Mr.equip tion and materials | 2016 | ||
Dr P ‘N E K “Ukr enerho” Western E C. | 79011 , m . Lviv and in in the street SC and ST iswho u b 2 T eul / fax (032) 256 – 32 – 23 | The complex is a lectromontazhny and x heat least and so on modern and zats uu panelcontrol pan Inn I 330 kV “Cal train and for the next ” according to affirmed workerTotal project «Modern zats Exposure andpanel control pan Inn I Substation 330 kV« Lvov and in for the next ” with about OJomitted complete set Mr. equip tion andmaterials | 2016 | ||
Dr P ‘N E K “Ukr enerho” Western E C. | 79011 , m . Lviv and in in the street SC and ST iswho u b 2 T eul / fax (032) 256 – 32 – 23 | The complex is a lectromontazhny and x heat least and so on modern and zats uu panelcontrol pan Inn I Substation 330 kV «Lvov and in Mr ivdenna “accordingconfirmed at first worker Total project”Modern and zats Exposure is Mr. Lei Icontrol pan Inn Substation 330 kV « Lvovand in southern ” with about ov’yazkovoyucomplete set equipment and materials | 2016 | ||
Dr P ‘N E K “Ukr enerho” Western E C. | 79011 , m . Lviv and in in the street SC and ST iswho u b 2 T eul / fax (032) 256 – 32 – 23 | The complex is a lectromontazhny and x heat least and so on modern and zats uu panelcontrol pan Inn I Substation 330 kV «Yavor and in » » according to affirmed wasat bochoho Total project «Modern zatsExposure and panel control pan Inn ISubstation 330 kV « Yavor and in » withabout OJ omitted complete set Mr. equiption and materials | 2016 | ||
Communal enterprise “Kharkiv and Vodokanal “ | 61052, .H ar k and, in UL.Chervonyozhovtneva , 90 ( 057 ) 712-34-34 | 1) Installation and implementation OEsystem and managing the Ob ‘is ktah KP “Kharkov and vvodokanal” 2) Repair inand juice on volt and x 6 kV cells withDeputy inoyu w / you mykachiv RZA anddevices for object ‘is ktah KP “Kharkovand vvodokanal” 3) Incarnation andreconstruct and me devices compensate for it reactive th power the Ob ‘is ktah CE”Harkivvodokanal” | 2007 – 2017 | ||
Dr P ‘N E K “Ukr enerho” | 01302, m .K and in her, in UL. Petliuri , 25 Tel: (044) 238-30-15 Fax: (044) 238-32-64 | Reconstruction and me and Technical ichne pereosn tion and Shchen to arrat andTransmission and commands RH and PA at 330 kV “And Vano-Frank and Su b k”PLAN 330 kV and Chern and EC | 2015 | ||
JSC “Poltavaobl is nerho” | 36022, m .Pоltava , in UL. Star and also from Pand L 5 Tel: (0532) 51 – 05 – 65 | Closely stacked and n and also dstants Andb Chernukha co ns th f and l AI JSC”Poltavaobl is nerho” S systems gear anddan and x (SPD) “ | 2015 | ||
F and L Exposure “Heat islektrotse Mr. trawl” of”DV NA FT wouldOHAZVYDO in oncompanies and I” | 63524, Kharkov and b SunCountry region. Nd Su bChuguyiv cues reg, smt . E shar in ul.152 p andb Lec co th See and AI, 16 | Complex installation of them andpuskonala th e’s chewing ie, the obi on TH5, and the System 15T excitation | 2014 – 2015 | ||
VP P ishnic power system Dr P “H E K” Ukr e st st “ | 61003 Kharkiv, street Cooperative, 12/14 | In an accomplishment obi, the cap and soon Talne he is funding to renovate autotransformer 330 kV JSC “Los is t” | 2014 | ||
Ltd. “Promatom” | 01901, Ci g th at, Pechers b cue district, in UL. Suvorov, 4/6 | R o bot and the City odern and zats uu110/10 kV “Shchors” in .SCH ORS, andMr. Chern VS and co st region b., I turn | 2014 – 2015 | ||
Ltd. “E nerdzh and Servand with » | 01901, Ci g th at, Pechers b cue district, in UL. Gosp and Talna , 12-D Tel. (044) 496-14-60 | Deputy and power transformers 154/35/10 kV T-1 on SS “Kremenchug – town” PA T”POLTAVAOBL E NERHO” | 2013 – 2014 | ||
Ltd. “Promatom” | 01901, Ci g th at, Pechers b cue district, in UL. Suvorov, 4/6 | Reconstruct and I SS “Dykanka” 110/35/10 kV Deputy and no yu 2T inpower transformers of 16 MVA and atNob and B Dykans one district in BPoltavs co st region. | 2013 | ||
Ltd. “Promatom” | 01901, Ci g th at, Pechers b cue district, in UL. Suvorov, 4/6 | Reconstruct I-110 kV switchyard Substation 110/10 kV « Suprun and Vka »with Deputy and no yu power transformers 1T | 2013 | ||
Ltd. “E nerdzh and Servand with » | 01901, Ci g th at, Pechers b cue district, in UL. Gosp and Talna , 12-D Tel. (044) 496-14-60 | Reconstruct and I 110/6 kV “Turboz andwater” in. Poltava with Deputy and no yupower transformers | |||
Ltd. “E nerdzh and Servand with » | 01901, Ci g th at, Pechers b cue district, in UL. Gosp and Talna , 12-D Tel. (044) 496-14-60 | Reconstruct and I RP-6 kV th address: c.L ysychans b k in UL. Agafonova, 2ALLC “L E O” | 2013 | ||
LLC ” E nergoserv andwith PMK” | 61013, Har d and k, in UL. Shevchenko, 60, (057) 760-13-51 | Reconstruction I prosp. The Moscow bcue from in UL. Dobrokhotova to Prospekt P ‘yatydesyaty th C R SR. B andn and p pillars PLAN 110 kV. ( Stud and I) | 2013 | ||
CRL ” Kr and mtroleibus” | 95034, Cr and m , m. С and the city of m . in UL. Ki Su b ca th, 78 0652 27-10-42 | Creation her complex systems andtelemehan and ki and incarnation systemsand ASK OE at 34 TPPs. Tues and Sunreconstruction and compensation settingsuu I reactive th power | 2011 – 2013 |
In re LIC YKONANYH OBJECTIVE V DISTRIBUTION PROJECT | |||
Name For the broadcaster | Address a and thephone For the broadcaster | Subject contract in | Period in anaccomplishmentp obit t |
SE “NEK” UKRENERGO “ | 01032, Kyiv , Ukraine st. Simona Petliura, 25, tel. (044) 238 30 15 | Project work. Technical pereosnascheMr. tion GRP -750 kV 750 kV “Pivdennodonbaska” with replacementTOG-750 kV current transformers (F, A, B, C) connection of TS EV 1 SZ 750 PL ZNPP to new insulated gas. Donetsk region, Nikolsky district, with. Kremenivka, st.Yuzhnodonbass | 2018-2019 |
SE “NEK” UKRENERGO “ | 01032, Kyiv , Ukraine st. SimonPetliuri , 25, Tel. (044) 238 30 15 | Design work on the facility: “Technical re-GRP-750 kV 750 kV” Pivnichnoukrains’ka “by substituting d efektnyh gas-insulated current transformers of 750 kV transmission line at Kola NPP reliable s.Zaruddya, Romny district, Sumy region | 2018-2019 |
LLC ” Alvis “ | 61001 , m. Kharkiv, street Plekhanovska , 126/1 | Design works on the reconstruction circuit 6 kV with installation of additional cells in RU 6 kV distribution cables and etc. at kladannya two cables of 0,4 kV substations street-RU 630 kVA to 0.4 kV at that location is in the territory of SPS Van №2a Bavarian | 2018 |
LLC ” Alvis “ | 61001 , m. Kharkiv, street Plekhanovska , 126/1 | Reconstruction of the cable line of the inv. № 576 from the state of emergency PE “YUsI” to the KSS number 24 on the site from the KNS number 24 to the house number 33 on the street. Roman Levytsky, 700 meters long. | 2018 |
Communal enterprise “Kharkivvodokanal “ | 61013, m. Kharkiv street Shevchenko a , 2, | R obochyy project “Technical pereosnasche Mr. tion blower station building (new unit) municipal wastewater treatment plants roles create a single railway maintenance №1Communal enterprise “Kharkivvodokanal ” at the address of Kharkov, street. Biological, 1 » | 201 8 |
PJSC ” Vinnytsyaoblenergo “ | 21050, m. Vinnitsa, st.Magistrate, 2 | Development of design estimates Docum e ntatsiyi “Reconstruction of the complex, etc. Straw and relaying overhead transmission lines of 110 kV substations of 110 kV power grid c. Vinnitsa arrangement of feeds andshowers communication and data transmission “ | 2017 |
PJSC ” Vinnytsyaoblenergo “ | 21050, m. Vinnitsa, st.Magistrate, 2 | Development of design estimates Docum e ntatsiyi “Technical re-equipment of the device for theprevention of emergency automatics VRU-110 kV at Substation 110 kV “Tulchin” for the organization of the reception of teams SAVN with Substation -330 kV «Vinnitsa» | 2017 |
PJSC ” Vinnytsyaoblenergo “ | 21050, m. Vinnitsa, st.Magistrate, 2 | Development of design and estimate dock in mentation “Feasibility grounded in the bathroom and schematic design for a novlennyu BODSet on the SS 35-110 kV for compensation of reactive loads on networks 110-35 kV JSC “Vinnytsyaobl is nerho” | 2017 |
PJSC “CHERNIGIVOBLENERGO” | 14,000.0 m. Chernihiv, st.Gonchar, 40 | Development of design estimates Docum e ntatsiyi “Technical re-equipment with gear formatornoyi 110/10 kV substation” NRZ “c. Nizhyn Chernihiv region (1-3 g Th ha) ‘herd Iwork project | 2017 |
PJSC “CHERNIGIVOBLENERGO” | 14,000.0 m. Chernihiv, st.Gonchar, 40 | Development of design estimates Docum e ntatsiyi “Technical re-equipment of SS 110/35 / 10kV”Kulikovka “in town. Kuliky in ka , Chernihiv region (3rd stage) » Iherd work project | 2017 |
PJSC “CHERNIGIVOBLENERGO” | 14,000.0 m. Chernihiv, st.Gonchar, 40 | Development of design estimates Docum e ntatsiyi “Technical re-equipment of SS 110 / 10kV” Cats “in. Chernigov, Chern and hivskoyi region” I herd work project | 2017 |
LLC “Luch” | 61003, m. Kharkiv, prov.Troitsky, 8 | Development of design estimates Docum e ntatsiyi “Program for replacing olive oil and mica. PJSC “MMK named after Ilyich” | 2017 |
PJSC ” Sumyoblenergo “ | 40035, m. Sumy, streetYves and Sirk, d. 7 Tel. (0542) 65 – 94 – 49 | “Correcting the existing scheme andvnoho prospects of 35-110 kV electric networks of JSC” Sumyoblenergo “in 2006-2016 ii. With the extension of up to 2027 o ku” | 2017 |
PJSC ” Sumyoblenergo “ | 40035, m. Sumy, streetYves and Sirk, d. 7 Tel. (0542) 65 – 94 – 49 | Development of design estimates Docum e ntatsiyi “Technical re-equipment with gear formatornoyi substation 35 kV” Vilshany “with the establishment of BSC-35 kV” | 2017 |
PJSC ” Sumyoblenergo “ | 40035, m. Sumy, streetYves and Sirk, d. 7 Tel. (0542) 65 – 94 – 49 | Development of design estimates Docum e ntatsiyi “Technical re-equipment with gear formatornoyi substation 35 kV” Nedryhayliv “with the installation of 35 kV BSC” | 2017 |
PJSC ” Sumyoblenergo “ | 40035, m. Sumy, streetYves and Sirk, d. 7 Tel. (0542) 65 – 94 – 49 | N Development roektno estimatesdokum th th th ntatsi “Technical re-equipment with gear formatornoyi substation 35 kV” Yampil “with the establishment of 35 BOD kV “ | 2017 |
LLC “LUGANSK ENERGY COMMUNITY” | 92702, Luhansk oblast, m. Starobilsk, street Gorky, 123 tel .: +38 (064 61) 2-24-96 | Development of design estimates Docum e ntatsiyi: “Construction of transmission line 35 kV – vidpayky onAC Rayhorods b ca of OL 35 kVSlav’yanoserbska-Trohizbenka “working draft stage | 2017 |
LLC “LUGANSK ENERGY COMMUNITY” | 92702, Lugansk region,Starobelsk city , st. Gorky, 123 tel .: +38 (064 61) 2-24-96 | Developed Mr roektno estimates th herdocumentation “Construction of 6 kV transmission line 110 kV substationsRayhorods b ca 2209-c schA Tyn REM”stage Working draft | 2017 |
LLC “LUGANSK ENERGY COMMUNITY” | 92702, Lugansk region,Starobelsk city , st. Gorky, 123 tel .: +38 (064 61) 2-24-96 | Developed Mr roektno estimates th herdocumentation: “Reconstructiontransformer n estency 110 kV “Rayhorods b ka” Stage Work Project | 2017 |
PJSC “PEM” CEC “ | 49008, m . Dnipro street Dmitry Kedrin, 28 | N Development roektnoyi documentation: P is 35/6 kV substation design С-35 | 2016 |
PJSC ” Sumyoblenergo “ | 40035, m. Sumy, streetDemyan Korotchenko , 7 Tel. (0542) 65 – 94 – 49 | N Development roektnoyi documentation: ” Execution of capital repairs of hydrotechnical structures Mal’ of the divergivinghydroelectric power station “ | 2016 |
PJSC ” Sumyoblenergo “ | 40035, m. Sumy, streetDemyan Korotchenko , 7 Tel. (0542) 65 – 94 – 49 | N Development roektnoyi documentation: ” Project of technical re-equipment of transformer substation 110 kV” Romny “ | 2016 |
PJSC ” Sumyoblenergo “ | 40035, m. Sumy, streetDemyan Korotchenko , 7 Tel. (0542) 65 – 94 – 49 | N Develop documentation roektnoyi “ Project of technical re-equipment of transformer substation 110 kV “Lokotki “ | 2016 |
PJSC ” Sumyoblenergo “ | 40035, m. Sumy, streetDemyan Korotchenko , 7 Tel. (0542) 65 – 94 – 49 | N Develop documentation roektnoyi “ Project of technical re-equipment of transformer substation 110 kV “Vuzlov” | 2016 |
LLC “Ukr e Negroprom-3” | 03110, Ci g th at, in UL. Solomens b ca, 5 Tel. (044) 248-90-28 | Ro bot and on the river at least at this spand in the icon Noah is lektrych us partproject th heat e lektrostantsy it capacity3.5 MW in m. Koryuk and VKA Chern and g and bSu co st region. | 2016 |
LLC “Ukr e Negroprom-3” | 03110, Ci g th at, in UL. Solomens b ca, 5 Tel. (044) 248-90-28 | Ro bot and on the river at least at this spand in the icon Noah is lektrych us partproject zam ini h o thirio x oil and x inswitches 110 kV on e legazov and withDeputy inoyu panel protection atShostka ns and T b for th e C | 2016 |
F ilia JSC “FGC UES” – M EC The east | Ros Ya | Developed Designed documentationfor reconstruction measuring channelsn stations of PS220 kV ” Fevralskaya “Branches of OJSC “FSK UES” – MES of the East in part current transformersand their Tue at rynnyh chains | 2015 |
F ilia JSC “FGC UES” – M EC The east | Russia | Development of design documentation for construction, the measuring channels is pi railway station PS220 kV “Tunhala” branch of JSC “FGC UES” – MES East of the current transformers and their secondary circuits | 2015 |
F ilia JSC “FGC UES” – M EC The east | Russia | Development of design documentation for construction, the measuring channels is pi PS220 kV railwaystation “Skovorodino” branch of JSC “FGC UES” – MES East part and no current transformers and their secondary circuits | 2015 |
Branch of OJSC “FSK UES” | Russia | R zrobka of project documentation on the river is under construction measuring channels PS220 kV station”Lopcha” branch of JSC “FGC UES” – MES East in May of the current sformatoriv n and their chain of secondary th hill | 2015 |
Branch of OJSC “FSK UES” | Russia | Development of design documentation on the river is under construction measuring channels with dancing and PS220 kV “key” branch of JSC “FGC UES” – MES East in May of the current sformatoriv n and their chain of secondary th hill | 2015 |
LLC “Ukr e Negroprom-3” | 03110, Ci g th at, in UL. Solomens b ca 5 tel. (044) 248-90-28 | Sp o R o BSA Noah is lektrych us partT E O uu modern and zats MferopolskoC and E C T th of installing 2 GTUswith a capacity of 200 MW. | 2014 |
LLC “Ukr e Negroprom-3” | 03110, Ci g th at, in UL. Solomens b ca 5 tel. (044) 248-90-28 | Flexible project developmentcommunication 6kV TG-5 with GRU-6kV CHP “Darkhan” ( Mongolia ) | 2014 |
LLC “Ukr e Negroprom-3” | 03110, Ci g th at, in UL. Solomens b ca 5 tel. (044) 248-90-28 | Correction of relay protection andcontrol schemes ТГ-5 CHP “Darkhan” (Mongolia ) | 2014 |
LLC “Ukr e Negroprom-3” | 03110, Ci g th at, in UL. Solomens b ca 5 tel. (044) 248-90-28 | Implementation of synchronization andcontrol schemes TG excitement CHP-5 “Yes, the Khan” (Mongolia) | 2014 |
LLC “Ukr e Negroprom-3” | 03110, Ci g th at, in UL. Solomens b ca 5 tel. (044) 248-90-28 | Sp o R o BSA parts of none nd projecther documentation echoed Throne jointsunit in TG-5 on Dr P “TPP-2” E shar “. | 2013 |
LLC “Ukr e Negroprom-3” | 03110, Ci g th at, in UL. Solomens b ca 5 tel. (044) 248-90-28 | Project and was at a boat on modern andzats uu existing one systems andAutomatic frequency n th e ilennya(ACHD) protyvoavar and her ynoautomatic and tykyna PJSC “B and blotserk and Sun Country T E C” | 2013 |
For T «NPO» A e rocosmo ekollog and me Ukraine yiny “ | 61166, Ukraine in her cityin .H ar mo in ul.Bakul and11 Te l : (057) 719-18-28 | Complex project and x ie, the obi toimplement and vtomatyz of Old systemsand control and mon and toring at in herand her brother n and dshypnyk andTurbo unit at K-300-240 is nerhoblok№2 in Tripi and lsko th E C T | 2013 |
CRL ” Kr and mtroleibus “ | 95034, Cr and m , m. С and the city of m . in UL. Ki Su b ca th, 78 0652 27-10-42 | Creation her complex systems andtelemehan and ki and incarnationsystems and ASK OE at 34 TPPs. In tand i and reconstruction andcompensation settings uu I reactive thpower | 2011- 2013 |